The paper,combining with the geological advance forecast of new Datong-Xi’an Railway Qiaojiashan Shan Tunnel loess surrounding rock case,elaborates suitability,principle and operation points of TRT6000 advance geological prediction system.Based on field test examples,the practicability of the loess tunnel is verified.%结合新建大西铁路乔家山隧道黄土围岩超前预报实例,详细阐述TRT6000超前地质预报系统适用性、原理及操作要点。根据现场检测实例,验证其在黄土隧道中的实用性。
展开▼