以某长江码头改造工程为背景,提出了在码头改造工程中改建桩帽底标高比原桩帽标底标高低,且施工受水位影响大的高桩码头改建中桩帽施工采用悬吊支架施工的新技术、新方法.%With the background of Yangtze river wharf transformation construction,a new technology and method of suspension construction in high pile wharf pile cap transformation is supported. And in the pile cap's transformation, the bottom elevation of pile cap constructed with new constructed is lower than primitive method, the effect of water level on new method is less than primitive method.
展开▼