首页> 中文期刊> 《气象与环境研究:英文版》 >Practice and Thinking on Current Planning Environmental Impact Assessment of Transmission and Transformation Power Grid in Jiangsu Province

Practice and Thinking on Current Planning Environmental Impact Assessment of Transmission and Transformation Power Grid in Jiangsu Province

     

摘要

The planning environmental impact assessment( EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012,which played important roles in guiding and planning the following transmission and transformation projects in environmental protection.In this paper,through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid,legal basis and planning EIA practices,some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号