This paper investigates the techniques of using pontoon bridge with catamaran boats to solve the transportation problems on both sides of the Yellow River during the period of construction of Grand Wajiatan Yellow river bridge. It Provides a safe, fast and con-venient water transport channel for machinery, equipment, materials and concrete. It is a successful case of using military technology for civil purposes.%采用双体承压舟在哇加滩黄河特大桥搭设浮桥解决桥位处黄河两岸的施工期间的运输通道问题,是军品民用的成功案例。提供了两岸运送机械、设备、材料、混凝土等的安全、快捷、维护方便简单的水上交通通道。
展开▼