南京江宁开发区污水厂规模为80 000 m3/d.因该厂用边逐步被城市化,对产生臭气的构筑物进行臭气处理,处理工艺采用生物滤池法,臭气处理总量为113 000 m3/h.主要简述了除臭工程的实施方案以及建设和运行过程中的几点经验.%The wastewater treatment scale of Jiangning Development Zone Wastewater Treatment Plant has reached 80 000 mVd now. Because of the gradual urbanization of the area around the plant,the structures releasing odor should be deodorized. Biofilter was adopted as treatment process and the total odor treatment amount was 113 000 mVh. The paper introduced the implement scheme of the deodorizing engineering and some experiences on its construction and operation.