既有铁路牵引变电所还建方案浅析

         

摘要

With combination of the actual site condition, the paper introduces the removing of Youyi traction substation by means of application of window time for maintenance, and illustrates 27.5kV side equipment and equipment in main control room and the precautions and its construction, summarizes the characteristics of the construction, and offers several in details the removing scheme of points need to be respected during proposals.%结合施工现场实际,介绍了利用天窗时间对友谊牵引变电所进行移设,并详细叙述了27.5kV侧设备和主控室设备撤除方案及施工过程中的注意项点,总结了该项施工主要特点,并提出了几点建议。