首页> 外国专利> METHOD FOR DETERMINING power process losses for traction traction substations DC RAILWAY

METHOD FOR DETERMINING power process losses for traction traction substations DC RAILWAY

机译:牵引牵引变电所直流铁路电力过程损耗的确定方法。

摘要

Method of determining process losses of electric power equipment in traction substations included in the traction power supply system, comprising: measuring at traction substations DC voltage and current at 3.3 kV voltage level, characterized in that the measurement on the input traction substations transducers and devices in addition to them gain measurements are carried out synchronously with the high side voltage AC converter transformer, the measurement results are transmitted to Servais data processing through the corporate data network traction substations, from which power losses are determined by the technological to traction in traction substation equipment for the analyzed period of time as the power consumption difference of the respective measurement systems (according to the IS1 and IS2 and IS3).
机译:确定在牵引电源系统中包括的牵引变电站中的电力设备的过程损失的方法,包括:在牵引变电站处测量3.3 kV电压水平下的直流电压和电流,其特征在于,对输入的牵引变电站中的换能器和装置进行测量除此以外,与高压交流变流器变压器同步进行增益测量,测量结果通过公司数据网络牵引变电站传输到Servais数据处理,由技术确定牵引变电站设备的牵引功率损耗对于所分析的时间段,将其作为相应测量系统的功耗差异(根据IS1,IS2和IS3)。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号