首页> 外文学位 >Rework methods for stacked PCB SMT assemblies.
【24h】

Rework methods for stacked PCB SMT assemblies.

机译:堆叠式PCB SMT组件的返工方法。

获取原文
获取原文并翻译 | 示例

摘要

The basic trend of the electronics packaging industry is a movement to smaller more compact assemblies. Devices get smaller and package densities increase. However, there are limits as to how small and dense things can become before problems arise. Also, new ideas arise as to how to utilize the space on a PCB. Without any more room to add new components, or the technology to decrease the size, a common idea is to build upwards. Just as apartments can be stacked one on top of each other in New York City, components can be stacked on top of each other on a PCB. Though an advantage that a PCB has over a city is that, in certain situations, it is possible to stack PCBs themselves on top of each other, instead of trying to stack the components.;When working with stacked components or stacked PCBs, there are two general concerns during the production of the assembly; (1) added reflow cycles, and (2) added heat. In order to build a stacked component, at least one extra reflow cycle is required for the stacking. This same concept applies when stacking PCBs. It is generally accepted that adding extra thermal cycles can adversely affect the reliability of the product. Reflow temperatures must increase due to the additional density of doubling, tripling or quadrupling the component size, or adding extra PCB layers. With the recent change to lead-free solder pastes, these temperatures are already pushing the limit of heat tolerance for the components. Extra care must to be taken to remain within the acceptable windows for producing stacked assemblies. These windows close even tighter if a stacked assembly needs to be reworked.;With the growing cost of materials and the complexity of assemblies, especially with stacked components or PCBs, scrapping units is costly. Thus, a reliable and repeatable rework process can be very valuable. The challenge is to develop this process while avoiding the excess heat and multiple reflow issues. The goal of this thesis is to develop a tactical rework process for reworking a triple stacked PCB assembly.;There is already a rework method in place for this particular assembly, but it tends to use a "brute force" method of heating. Also, according to the operators, the success rate of this method is below fifty percent. The current method utilizes a rework station using infrared radiation. The profile appears to melt every joint in the entire assembly to perform the rework. Though the method does work, a more strategic approach may increase the rework success rate. At the very least, because the new process is using a different rework station, the rework capacity on this very important product will be increased by this new method.;A method using hot air convection was successfully implemented to rework the three-stack assembly. Because of the high copper density in the PCB layers it was not possible, with the available equipment, to keep the joints on the top PCB layer from reflowing, but this was still better than reflowing the entire assembly. The first 4 assemblies reworked had some issues, but after the final adjustment of the rework process 3 out of 3 assemblies passed system test after rework. This process also helped find issues with the data retention test part of the functional test procedure.
机译:电子封装行业的基本趋势是向更小,更紧凑的组件发展。器件变得更小,封装密度增加。但是,在问题出现之前,东西会变得多小和密集是有局限性的。而且,关于如何利用PCB上的空间,出现了新的想法。没有更多的空间添加新组件或减小尺寸的技术,通常的想法是向上构建。就像在纽约可以将公寓彼此叠放一样,组件也可以在PCB上叠放在一起。尽管PCB在城市中的优势在于,在某些情况下,可以将PCB本身彼此堆叠在一起,而不是尝试堆叠组件;当处理堆叠的组件或堆叠的PCB时,有组件生产过程中的两个一般问题; (1)增加了回流周期,(2)增加了热量。为了构建堆叠的组件,堆叠至少需要一个额外的回流周期。堆叠PCB时也适用相同的概念。通常认为增加额外的热循环会不利地影响产品的可靠性。由于元件尺寸增加了一倍,三倍或四倍,或者增加了额外的PCB层,因此必须增加回流温度。随着最近对无铅焊锡膏的变化,这些温度已经推高了组件的耐热极限。必须格外小心,以保持在可接受的窗口范围内以生产堆叠组件。如果需要对堆叠的组件进行重新加工,这些窗口甚至会关闭得更紧。随着材料成本的增加和组件的复杂性,特别是对于堆叠的组件或PCB,报废单元的成本很高。因此,可靠且可重复的返工过程非常有价值。挑战在于开发这种工艺,同时避免过多的热量和多次回流问题。本文的目的是开发一种用于对三重堆叠PCB组件进行返工的战术返工过程。该特定组件已经有返工方法,但是它倾向于使用“蛮力”加热方法。而且,据操作员说,这种方法的成功率低于百分之五十。当前的方法利用使用红外辐射的返修台。该轮廓似乎熔化了整个装配体中的每个接头以进行返工。尽管该方法确实有效,但更具战略性的方法可能会提高返工成功率。至少,由于新工艺使用的是不同的返修台,因此使用此新方法将提高非常重要的产品的返工能力。成功实施了一种使用热空气对流的方法来返修三叠式组件。由于PCB层中的铜密度很高,因此,使用现有设备无法使顶层PCB上的接缝不回流,但这仍然比回流整个组件更好。返工的前4个组件有一些问题,但是在对返工流程进行最终调整之后,返工后的3个组件中有3个通过了系统测试。此过程还有助于发现功能测试过程中数据保留测试部分的问题。

著录项

  • 作者

    Guinane, James.;

  • 作者单位

    State University of New York at Binghamton.;

  • 授予单位 State University of New York at Binghamton.;
  • 学科 Engineering Electronics and Electrical.;Engineering Industrial.
  • 学位 M.S.
  • 年度 2008
  • 页码 125 p.
  • 总页数 125
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 无线电电子学、电信技术;一般工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号