首页> 中文学位 >Critical Analysis of Implementation of Project Planning Scheduling in Construction Projects.
【6h】

Critical Analysis of Implementation of Project Planning Scheduling in Construction Projects.

代理获取

目录

声明

TABLE OF CONYENTS

LIST OF ABBREVIATIONS

Acknowledgment

ABSTRACT

摘要

CHAPTER 1 INTRODUCTION

1.1 Background of the research

1.2 Statement of the Problem

1.3 The Significance of the Study

1.4 Objectives of the Study

1.5 Research Questions and Hypothesis

1.5.1 Research Questions

1.5.2 Research Hypothesis

1.6 Dissertation Structure

1.7 The Scope of the Study

1.8 Summary

CHAPTER 2 LITERATURE REVIEW

2.1 Planning and Scheduling of Project

2.2 Planning and Schedufing Significance

2.3 Planning and Scheduling Successfully

2.4 Factors affecting Planning and Scheduling

2.5 Front-End Planning to Project Success

2.6 Literature Gap

2.7 Conceptual Framework and Proposed Hypothesis

2.8 Summary

CHAPTER 3 RESEARCH METHODOLOGY

3.1 Research Design

3.1.1 Research Philosophy

3.1.2 Research Approaches

3.1.3 Research Methods

3.2 Sampling Technique

3.3 Data Collection Methods and Samples

3.3.1 Data Collection process

3.3.2 Population and Sample Size of the Study

3.4 Questionnaire Administration

3.5 Research Instrument

3.5.1 Data Analysis Method

3.5.2 Pilot Study

3.6 Ethical considerations (include Research reliability and validity)

3.7 Limitation in the Adopted Methodsof Research

3.8 Summary

CHAPTER4 DATA ANALYSIS

4.1 Demographic Analysis

4.1.1 Pakistan Construction Projects

4.1.2 Coefficient of concordance of Kendall (W)

4.2 Results Analysis

4.2.1 Research Hypothesis 1

4.2.2 Research Hypothesis 2

4.2.3 Research Hypothesis 3

4.2.4 Research Hypothesis 4

4.3 Implications of Accepted Hypotheses and Rejected Hypotheses in Terms of Practices

4.4 Summary

CHAPTER5 CONCLUSION

5.1 Conclusion

5.2 Recommendation

5.2.1 Refining the competence of the company and know about scheduling and planning essentials

5.2.2 Concentrating on handling the enablers of the right size and the boundaries to challenge the scheduling and planning

5.2.4 Managing and identifying the shortcomings in the preparation of challenges early in the stage of planning

5.3 Limitations

5.4 Further Research Options

References

Appendices:Survey Questionnaire

展开▼

著录项

  • 作者

    Farrukh Waqas;

  • 作者单位

    山东大学;

  • 授予单位 山东大学;
  • 学科 Project Management
  • 授予学位 硕士
  • 导师姓名 Jun Wang;
  • 年度 2020
  • 页码
  • 总页数
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 旅游经济;
  • 关键词

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号