封面
英文摘要
中文摘要
详细摘要
目录
Chapter 1 Introduction
1.1 Background
1.2 Purpose and Significance of the study
1.3 Analysis of literature review at home and abroad
1.4 Contents and Methodology of the Research
Chapter 2 CPM and Lean Construction Theories Analysis
2.1 Critical Path Method
2.2 Lean Construction Management
2.3 Summary
Chapter 3 Planning Method of Preparing Construction Schedule Combining CPM and Lean Construction
3.1 The Beginning of a Plan of Construction Projects
3.2 Planning Method Strategies and Ranges of Action
3.3 Reducing Uncertainty of CPM in Construction Projects Applying Lean Construction Philosophy.
3.4 Supporting CPM diagram by identifying construction constrains
3.5 Summary
Chapter 4 Planning Control at the Field
4.1 Planning Control Advising (Do it right from the first beginning)
4.2 Critical Network Project Plan:The Planning Method
4.3 Approach of Work Breakdown Structure (WBS) using Value Stream Mapping (VSM)
4.4 Summary
Chapter 5 Case Study
5.1 Case Study Methodology
5.2 Project Introduction
5.3 Limitations of the Case Study
5.4 Conclusions and Contributions of the Case Study
5.5 Summary
Conclusions
参考文献
声明
致谢
Personal Resume