Prague Subway – Refurbishment and Maintenance of Older Lines

机译:布拉格地铁–旧线的翻新和维修

获取原文
获取原文并翻译 | 示例

摘要

The first line of Prague’s subway system, the Metro, was inaugurated 30 years ago. Today, the PraguernMetro is operating a network of routes exceeding 50km. The alignment of the lines lies largelyrnbeneath the ground water table, often within the Vltava River’s flood-plain terrace. It passes under thernriver three times. This fact, combined with the fact that the initial tunnelling technique was based onrnthe ring method adopted from the Moscow Metro construction, which was not capable of securingrnwaterproof tunnels, causes the current huge demand for maintenance and refurbishment work. Withoutrnelastic filling, the joints between the reinforced concrete or cast iron segments are sources ofrnsignificant leakage. The leaks have had to be removed using polyurethane resins. Long-term sealing ofrnthe leaking joints, guaranteeing permanentelasticity and bond to substrate, has been achieved by arncombination of injection materials and compounds. Our paper contains experience gained from thernremedial operations, their results, and our recommendations.
机译:布拉格地铁系统的第一线地铁(Metro)于30年前启用。如今,布拉格地铁正在运营超过50公里的路线网络。线的对齐方式主要位于地下水位下方,通常在伏尔塔瓦河河的平原地区。它在转口下方经过了三遍。这个事实,加上最初的隧道技术是基于莫斯科地铁建设中采用的环法而无法确保防水隧道的事实,导致当前对维护和翻新工作的巨大需求。在没有弹性填充的情况下,钢筋混凝土或铸铁部分之间的接缝是大量泄漏的根源。必须使用聚氨酯树脂消除泄漏。通过注入材料和化合物的复合,可以实现对泄漏接头的长期密封,以确保永久弹性和与基底的粘合。我们的论文包含了从补救行动中获得的经验,其结果以及我们的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号