首页> 外文会议>WM '99 conference >DISMANTLING THE WINDSCALE ADVANCED GAS COOLED REACTOR PRESSURE VESSEL AND INSULATION - DESIGN AND DEVELOPMENT
【24h】

DISMANTLING THE WINDSCALE ADVANCED GAS COOLED REACTOR PRESSURE VESSEL AND INSULATION - DESIGN AND DEVELOPMENT

机译:拆除先进的燃气冷却反应堆压力容器和保温装置-设计与开发

获取原文

摘要

Progress on Project WAGR-Decommissioning the Windscale Advanced Gas Cooled Reactorhas reached a major milestone with the letting of the contract for the provision of tooling andmethodologies to enable the Reactor Pressure Vessel and Insulation (PV&I) to be dismantled.This paper describes the design and development phase of the contract, explaining briefly thepreferred methodology and detailing first tests performed to check the feasibility and theefficiency of the chosen dismantling processes, before undertaking the design.
机译:WAGR项目的退役-风标高级气冷堆的退役已经达到了一个重要的里程碑,该合同的签订是提供了用于拆除反应堆压力容器和绝缘(PV&I)的工具和方法的合同。本文介绍了设计和开发合同的第一阶段,简要说明了首选的方法,并详细介绍了在进行设计之前进行的首次测试,以检查所选拆除过程的可行性和效率。

著录项

  • 来源
    《WM '99 conference》|1999年|p.1-12|共12页
  • 会议地点 Tucson, AZ(US)
  • 作者

    F. Bazerque; J. Halladay;

  • 作者单位

    European Nuclear Technologies Bristol UK;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号