首页> 外文会议>WM '99 conference >CHEMICALS AND EXCESS MATERIALS DISPOSITION DURING FACILITY DEACTIVATION AS A MEANS OF POLLUTION PREVENTION
【24h】

CHEMICALS AND EXCESS MATERIALS DISPOSITION DURING FACILITY DEACTIVATION AS A MEANS OF POLLUTION PREVENTION

机译:设施停用期间的化学物质和多余物质处置作为一种防止污染的手段

获取原文

摘要

This paper presents several innovative and common sense approaches to pollution preventionthat have been employed during facility deactivation at the Hanford site in South CentralWashington. It also presents several pollution prevention principles applicable to other projects.Innovative pollution prevention ideas employed at the Hanford site during facility deactivationincluded:1) Recycling more than 185,000 gallons of radioactively contaminated nitric acid by sending itto an operating nuclear fuels reprocessing facility in England.2) Recycling millions of pounds of chemicals and excess materials to other industries for reuse.3) Evaporating flush water at a low rate and discharging it into the facility exhaust air stream toavoid discharging thousands of gallons of liquid to the soil column.4) Decontaminating and disposing of thousands of gallons of radioactively contaminatedorganic solvent waste to a RCRA licensed, power-producing, commercial incinerator.Common sense pollution prevention ideas that were employed include recycling office furniture,recycling paper from office files, and redeploying tools and miscellaneous process equipment.Additional pollution prevention occurred as the facility liquid and gaseous discharge streamswere deactivated.From the facilities deactivation experiences at Hanford and the ensuing efforts to dispositionexcess chemicals and materials, several key pollution prevention principles should be consideredat other projects and facilities, especially during the operational periods of the facility’s mission.These principles include:? Institute pollution prevention as a fundamental requirement early in the planning stage of aproject or during the operational phase of a facility’s mission.? Promote recognition and implementation of pollution prevention initiatives? Instill pollution prevention as a value in all participants in the project or facility work scope? Minimize the amount of chemical products and materials on hand during facility operations,in anticipation of a shutdown or abrupt end to the operating phase of the mission? Plan the final facility operating periods to minimize residual chemical products and inprocessmaterials left at the end of the mission.
机译:本文介绍了华盛顿中南部汉福德基地设施停用期间采用的几种创新的常识性污染预防方法。它还提出了一些适用于其他项目的污染预防原则。汉福德工厂在设施停用期间采用了创新的污染预防构想,包括:1)通过将其运送到英格兰的运行中的核燃料后处理设施中回收185,000加仑的放射性污染硝酸.2 )将数百万磅的化学药品和多余的材料循环利用到其他行业中以供再利用; 3)以低速率蒸发冲洗水,并将其排放到设备的废气流中,以避免将数千加仑的液体排放到土壤柱中.4)进行消毒和处理将有数千加仑放射性污染的有机溶剂废物处理到RCRA许可的发电商业焚化炉中。采用的常识性污染预防措施包括回收办公家具,回收办公文件中的纸张以及重新部署工具和其他处理设备。污染防治从汉福德(Hanford)的设施停用经验以及随之而来的处置过量化学物质和材料的努力中,应在其他项目和设施中考虑一些关键的污染预防原则,尤其是在设施运行期间这些原则包括:在项目的规划阶段初期或设施任务的运营阶段,将预防污染作为一项基本要求。促进对污染预防措施的认可和实施?在项目或设施工作范围的所有参与者中注入预防污染的价值?在设备运行期间,如果预计要关闭或突然结束任务的运行阶段,则要尽量减少手中的化学产品和材料的数量?计划最终的设备运行时间,以最大程度地减少任务结束时残留的化学产品和加工材料。

著录项

  • 来源
    《WM '99 conference》|1999年|p.1-11|共11页
  • 会议地点 Tucson, AZ(US)
  • 作者单位

    B&W Hanford Company S4-49 Richland Washington 99352;

    B&W Hanford Company S4-49 Richland Washington 99353;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号