首页> 外文会议>Twelfth European Conference on Soil Mechanics and Geotechnical Engineering, Jun 7-10, 1999, Amsterdam/Netherlands >Experiences from the construction of the Athens Metro project Experiences obtenues par la construction du Metro d' Athenes
【24h】

Experiences from the construction of the Athens Metro project Experiences obtenues par la construction du Metro d' Athenes

机译:雅典地铁项目建设的经验雅典地铁城市建设的经验

获取原文
获取原文并翻译 | 示例

摘要

The on-going construction of the Athens Metro has provided extensive experience on soft ground tunneling in urban environment. The paper reviews the local geological and geotechnical conditions (Athens schist formation), the applied construction practices (TBM excavated running tunnels and stage excavation of station caverns), the technical complications (mainly due to TBM over-excavations) and the methods used to resolve the construction problems (ground pre-treatment). It is concluded that the technical difficulties are due to the combined effects of the extremely heterogeneous ground conditions and the existence of deep ancient man-made structures (wells, water conduits, etc).
机译:正在进行的雅典地铁建设为城市环境中的软土地基隧道建设提供了丰富的经验。本文回顾了当地的地质和岩土条件(雅典片岩形成),应用的施工实践(TBM开挖的运行隧道和车站洞室的阶段开挖),技术复杂性(主要是由于TBM的过分开挖)以及解决方法施工问题(地面预处理)。结论是,技术上的困难是由于极端异质的地面条件和深厚的古代人造结构(井,水渠等)的综合作用造成的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号