Experience in Construction in Hard Rock with Roadheader in the Ariz -Basauri section of the Bilbao Metro

机译:毕尔巴鄂地铁Ariz -Basauri段的掘进机在硬岩中的施工经验

摘要

The object of the works to be performed is the extension of the Bilbao Metro network (Vizcaya, Basque Region, Spain). The Ariz-Basauri section of line 2 of the Bilbao Metro is being performed by the UTE Ariz-Basauri, a joint venture formed by the companies Exc. Cantábricas S.A., Vda. de Sainz S.A. and Obras Subterráneas S.A. The total length of the section is 2,372 m. of which 2,108 m. are performed in mine tunnel. The section will provide a service to the centre of Basauri with two stations, Ariz station commencing approximately at KP 1+050 and Basauri station at KP 2+105. Introduction of a new transport infrastructure such as a Metro system in an urban environment has an inevitable impact which must be quantified and, as far as possible, minimized. This impact on the urban environment includes a number of aspects, affecting networks and services, buildings, road traffic and rail traffic, not only influencing the line layout, but also and in particular the construction processes to be applied to ensure a minimum impact on both the existing infrastructure and the population. From the constructor’s viewpoint the shallow nature of the work at around 25 m should be highlighted as well as a work plan requiring 3 shifts and involving night work. The decision taken by ETS (Euskal Trenbide Sarea) not to use explosives due to the urban environment in which the Metro is developed is therefore comprehensible.
机译:作品的目标是扩展毕尔巴鄂地铁网络(西班牙巴斯克地区比斯开)。毕尔巴鄂地铁2号线的Ariz-Basauri部分由UTE Ariz-Basauri(由Exc公司成立的合资企业)负责。 CantábricasS.A.,Vda。 de Sainz S.A.和ObrasSubterráneasS.A.断面的总长度为2,372 m。其中2,108 m。在矿井隧道中进行。该部分将通过两个站向Basauri中心提供服务,Ariz站大约从KP 1 + 050开始,而Basauri站从KP 2 + 105开始。在城市环境中引入新的运输基础设施(例如地铁系统)具有不可避免的影响,必须对其进行量化,并尽可能将其最小化。对城市环境的影响包括多个方面,影响网络和服务,建筑物,道路交通和铁路交通,不仅影响线路布局,而且尤其是要确保最小化对两者影响的施工过程现有的基础设施和人口。从施工人员的角度来看,应该强调25 m左右的浅层工作,以及需要三班倒并涉及夜班工作的工作计划。因此,ETS(Euskal Trenbide Sarea)做出的不使用爆炸物的决定是可以理解的,因为地铁所在的城市环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号