首页> 外文会议>European Conference on Soil Mechanics and Geotechnical Engineering vol.4; 20030825-28; Prague(CZ) >Geotechnical issues of metro construction in a historic built-up area (Experience gained during the preparations and the construction of the Prague metro in 1966-1985)
【24h】

Geotechnical issues of metro construction in a historic built-up area (Experience gained during the preparations and the construction of the Prague metro in 1966-1985)

机译:历史建筑区中地铁建设的岩土工程问题(在1966-1985年布拉格地铁的准备和建设过程中获得的经验)

获取原文
获取原文并翻译 | 示例

摘要

Prague, the capital of the Czech Republic, is one of the oldest and most preserved historic cities in Central Europe. The construction of tunnels for subway under the city was thus a great technical problem. A range of special tunnel technologies had to be developed. On the other hand excavation of the tunnels brought a large number of archeological and historical information.
机译:布拉格是捷克共和国的首都,是中欧最古老,保存最完好的历史名城之一。因此,在城市下建设地铁隧道是一个很大的技术问题。必须开发一系列特殊的隧道技术。另一方面,隧道的开挖带来了大量的考古和历史信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号