首页> 外文会议>European Conference on Soil Mechanics and Geotechnical Engineering vol.4 >Geotechnical issues of metro construction in a historic built-up area (Experience gained during the preparations and the construction of the Prague metro in 1966-1985)
【24h】

Geotechnical issues of metro construction in a historic built-up area (Experience gained during the preparations and the construction of the Prague metro in 1966-1985)

机译:历史建筑区地铁建设的岩土问题(1966年至1985年在筹备工作期间获得的经验和建设布拉格地铁建设)

获取原文

摘要

Prague, the capital of the Czech Republic, is one of the oldest and most preserved historic cities in Central Europe. The construction of tunnels for subway under the city was thus a great technical problem. A range of special tunnel technologies had to be developed. On the other hand excavation of the tunnels brought a large number of archeological and historical information.
机译:布拉格是捷克共和国的首府,是中欧最古老,最常放的历史城市之一。 因此,城市下地铁隧道的建设是一个很好的技术问题。 必须开发一系列特殊的隧道技术。 另一方面,隧道的挖掘带来了大量的考古和历史信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号