...
首页> 外文期刊>The Indian concrete journal >Construction of viaduct for metro express line using 25 m long precast U girders - An experience
【24h】

Construction of viaduct for metro express line using 25 m long precast U girders - An experience

机译:使用25 m长的预制U梁为地铁快线建造高架桥-经验

获取原文
获取原文并翻译 | 示例
           

摘要

The Airport Metro Express Line is the first exclusive line with dedicated check-in counters away from airport at city centre and at city's main railway station. The design speed of this line is 135 kmph with a provision to increase it to 160 kmph. The line starts from New Delhi railway station's Ajmeri Gate to Dwarika sector-21 via Indira Gandhi International Airport. It has six stations namely New Delhi, Shivaji stadium, DhaulaKuan, Delhi Airo city, IGI airport and Dwarika Sector-21 station. This 22.50 km project has 7.185 km elevated corridor and the rest is underground.
机译:机场地铁特快专线是第一条专属专线,其专用检票柜台位于市中心和城市主要火车站之外的机场。该生产线的设计速度为135公里/小时,可提高到160公里/小时。该线路从新德里火车站的Ajmeri门经Indira Gandhi国际机场到达Dwarika 21区。它有六个车站,分别是新德里,Shivaji体育场,DhaulaKuan,德里Airo市,IGI机场和Dwarika Sector-21车站。这个22.50公里的项目有7.185公里的高架走廊,其余的都在地下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号