...
首页> 外文期刊>PCI Journal >Metrorrey's linea 2 extension viaduct: A revolution for light-rail precast concrete segmental bridges
【24h】

Metrorrey's linea 2 extension viaduct: A revolution for light-rail precast concrete segmental bridges

机译:Metrorrey的Linea 2延伸高架桥:轻轨预制混凝土分段桥的革命

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Metro of Monterrey's new 6.6-km-long (4.1 mi) linea 2 extension viaduct in Monterrey, Mexico, completed in September 2008, includes a revolutionary concept for precast concrete segmental light-rail bridges developed by Juan Jose Goni Baamonde. The 37-m-long (121 ft), 9.2-m-wide (30 ft) typical spans have a U-shaped cross section that allows the two rail tracks to be placed within the structure envelope, which reduces noise, danger of derailment, and visual impact. In addition, the typical segment contains only 45 kg of structural reinforcement per cubic meter of concrete (76 1b/yd~3) concrete with 10M (no. 3) bars, whereas most current light-rail segmental bridges typically contain concrete with a density of about 120 kg/m~3 (200 1b/yd~3). This was accomplished with a unique use of transverse and longitudinal internal tendons. The concept offers a viable and more economical alternative to the typical box-girder cross sections for light-rail bridges.
机译:墨西哥蒙特雷的地铁新长6.6公里(4.1英里)的Linea 2延伸高架桥于2008年9月竣工,其中包括胡安·何塞·戈尼·巴蒙德开发的预制混凝土分段轻轨桥梁的革命性概念。 37米长(121英尺),9.2米宽(30英尺)的典型跨度具有U形横截面,可将两条轨道放置在结构围护结构内,从而降低了噪音和出轨危险以及视觉冲击。此外,典型的路段每立方米的混凝土(76 1b / yd〜3)钢筋和10M(3号)钢筋仅包含45 kg的结构钢筋,而大多数当前的轻轨分段桥通常包含密度较高的混凝土约120 kg / m〜3(200 1b / yd〜3)。这是通过独特地使用横向和纵向内部肌腱来完成的。该概念为轻轨桥梁的典型箱形梁截面提供了可行且更经济的替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号