Construction Highlights and Lessons Learned Constructing Precast Concrete Segmental Viaducts of CA/T, I-90/I-93 Project

机译:建造CA / T,I-90 / I-93项目的预制混凝土分段高架桥的施工要点和经验教训

获取原文

摘要

Four years ago, a paper was submittedand published (1) on the design aspects of the CentralArtery/Tunnel (CA/T) C09A4 Concrete Viaducts. Nowthat the construction is approaching completion, thedesigner reflects on the construction aspects of thiscomplex system of segmental concrete viaducts andparticularly the lessons learned. This paper isorganized in three parts as follows:Part I: Provides a brief description of the projectand the site, the superstructure, and the substructure(reference 1 provides the detail on these). Also thispart includes a brief description of the precastoperation, and erection method and sequence.Part II: Focuses on two innovative features usedspecifically on this project to improve project durationor to facilitate Segmental Viaduct construction namely;1. Precast Fixed (integral) Bent Segments, and 2.Precast Saw-cut segments.Part III: Presents several ‘lessons learned’ basedon the author’s experience and involvement on theproject from the conceptual phase through theconstruction.
机译:四年前,关于CentralArtery / Tunnel(CA / T)C09A4混凝土高架桥的设计方面的论文已提交并发表(1)。既然建造工作即将完成,设计人员将对这种复杂的分段混凝土高架桥系统的建设方面进行反思,尤其是汲取的经验教训。本文分为以下三个部分:第一部分:对项目,场地,上部结构和下部结构进行简要说明(参考文献1提供了详细信息)。本部分还包括对预制操作以及安装方法和顺序的简要说明。第二部分:着重于该项目专门使用的两个创新功能,以改善项目工期或促进分段高架桥的建设; 1。预制的固定(整体)弯曲部分,以及2的预制锯切部分。第三部分:根据作者在概念阶段到施工阶段的经验和对项目的参与,介绍一些“经验教训”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号