【24h】

Anchored structure technology of loosen soft seam with big dip angle in compound roof

机译:复合顶板大倾角松软煤层锚固结构技术

获取原文
获取原文并翻译 | 示例

摘要

There is the uncertainty of tilting angle of coal seam, large variation of thickness of top coal in Taiping Coal Mine +-700 m level.It caused many difficulties to the production and management, In view of the coal seam occurrence condition of 32151 working face, it is analyzed based on the coal seam thickness, dip angle, the seam roof and floor conditions, working face management difficulty, coal quality and safety condition, the effective method of greater inclined full-mechanized coal seam is proposed.The mine has carried on the detailed supporting design to the first fully mechanized caving face with the Dynamic system design method of the bolt support, that is FLAC3D finite difference numerical simulation software.The Safe and efficient mining of the first sub-level caving mining working face is smoothly realization.
机译:太平煤矿+ -700 m水平煤层存在倾角不确定,顶煤厚度变化较大的特点,鉴于32151工作面煤层的发生状况,给生产和管理造成许多困难。根据煤层厚度,倾角,煤层顶板和底板条件,工作面管理难度,煤质和安全条件进行了分析,提出了大倾角综采煤层的有效方法。锚杆动态系统设计方法,即FLAC3D有限差分数值模拟软件,对第一个综放工作面进行详细的支护设计。顺利实现第一个分段放水工作面的安全高效开采。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号