首页> 外文会议>The IEEE International Conference on Information Management and Engineering;ICIME >Fuzzy-Safety-Buffer approach for project buffer sizing considering the requirements from project managers and customers
【24h】

Fuzzy-Safety-Buffer approach for project buffer sizing considering the requirements from project managers and customers

机译:考虑项目经理和客户要求的项目缓冲区大小的模糊安全缓冲区方法

获取原文

摘要

This paper proposes a Fuzzy-Safety-Buffer approach for measuring the project buffer size in critical chain project scheduling. The method focuses on the combination of the requirements of the project manages and the customers. Firstly using the trapezoidal fuzzy function, agreement index presents the project managers' requirement. Then the safety buffer concept derived from the safety stock concept is used to optimize the AI value considering the request of the customers. Finally a function is introduced to integrate two demands using the agreement index and the safety buffer as parameters. With a case study, FSB approach get better results relatively compared with other methods. Furthermore, an extensive analysis is added to indicate the different results with varying continuous variance of the project duration.
机译:本文提出了一种用于在关键链项目调度中测量项目缓冲区大小的模糊安全缓冲区方法。该方法着重于项目管理和客户需求的结合。首先使用梯形模糊函数,协议指标提出了项目经理的要求。然后,根据客户的要求,使用从安全库存概念派生的安全缓冲概念来优化AI值。最后,引入了一个功能,以协议索引和安全缓冲区作为参数来集成两个需求。通过案例研究,FSB方法相对于其他方法可获得更好的结果。此外,还进行了广泛的分析,以表明随着项目持续时间的不断变化而产生的不同结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号