Stability of dragline waste rock dump in an Indian opencast coal mine

机译:一家印度露天煤矿的吊斗铲废石堆的稳定性

获取原文
获取原文并翻译 | 示例

摘要

India ranks third in world coal production mainly due to 89% contribution from opencast miningrnor surface mining technology. Coal India (a major coal producing organization in India) produced 431.27rnmillion tonnes of coal in the year 2009-10 from opencast mining. It is pertinent here to mention that to minernout 431.27 million tonnes of coal from opencast mining, 695.29 million cubic metre of waste rock and soilrnwas excavated in the year 2009-10. But a major hindrance in sustaining this level of coal production fromrnopen cast coal mining is area of land involved. It is estimated that by 2025, total land to be involved due tornopencast coal mining will be 2925 sq. km (including 730 sq.km of forest land) as against the present coveragernof 1470 sq. km.rnThis socio-environmental predicament requires a solution and the only possible way to reduce the area of landrnaffected is to increase the slope angle of the waste dump embankments. However, this solution creates anotherrnproblem in itself i.e. the stability of the waste rock dump. It is considered as one of the major issues faced inrnthe open cast coal mining operation due to slope failures resulting in fatal accidents in some of the large opencastrnmines of India.
机译:印度在世界煤炭产量中排名第三,这主要归功于露天采矿或地面采矿技术的89%贡献。印度煤炭公司(印度主要的煤炭生产组织)在2009-10年度通过露天开采生产了431.27亿吨煤炭。与此相关的是,在2009-10年度,从露天采矿中开采了4.327亿吨煤炭,挖掘了6.529亿立方米的废石和土壤。但是,从露天开采的煤炭中维持煤炭产量的主要障碍是土地面积。据估计,到2025年,露天开采煤炭将涉及的总土地面积将为2925平方公里(包括730平方公里的林地),而目前的覆盖面积为1470平方公里。这种社会环境困境需要解决方案减少受灾土地面积的唯一可能方法是增加垃圾场路堤的倾斜角度。然而,该解决方案本身产生了另一个问题,即废石堆的稳定性。由于边坡失稳导致印度一些大型露天煤矿的致命事故,这被认为是露天煤矿开采面临的主要问题之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号