PASTE THICKENING OF TAILINGS AT THE CLERMONT COAL PREPARATION PLANT

机译:Clermont选煤厂的尾矿浆稠化

获取原文
获取原文并翻译 | 示例

摘要

The Clermont Coal Mine is a new mine located in the western edge of the Bowen Basin adjacentrnto the township of Clermont. The mine is owned by the Clermont Coal Joint Venture (CCJV) andrnwhen fully developed will produce 12 Mt/a of thermal coal product. The mine is being developed asrna replacement for the existing Blair Athol Coal Mine (Blair Athol) owned by the separate Blair AtholrnCoal Joint Venture (BACJV). The majority shareholder and operator of both projects is Rio TintornCoal Australia (RTCA).rnThe overburden is being stripped via a truck and shovel open pit operation utilising an in pitrncrushing and conveying (IPCC) system. The mining of the coal will be a truck and shovel open pitrnoperation. A large proportion of the coal is less than ten per cent ash in situ, and the large seamrnthicknesses allow mining with little or no out-of-seam dilution. This means that the majority of therncoal is simply sized and stockpiled.rnA 300 t/h Coal Preparation Plant (CPP) is required to treat around 10 per cent of the Run of Minern(ROM) coal to ensure that the product specification is met. This CPP uses dense medium cyclones torntreat the coarse coal fraction (-50 mm + 2 mm) and spirals to treat the fine coal fraction, (-2 mm +rn0.1 mm) with the slimes (-0.1 mm) being untreated and sent for disposal.rnAt the feasibility study stage, all rejects were to be co-disposed. Co-disposal involves the pumpingrnof all the CPP reject material together. This co-disposal would require approximately 636 ML ofrnwater per year. Initial groundwater studies had reported that this water would be available fromrnunderground sources. Further investigation showed this to be incorrect and a new philosophy hadrnto be adopted.rnA number of technologies were investigated to dewater and dispose of the reject material withrnthe final selection being a multi-slope drain and rinse screen to dewater the coarse material, a highrnfrequency screen to dewater the fine rejects and a paste thickener to recover the water from thernslimes material.rnThe Clermont CPP will be the first greenfields installation of a paste thickener in the coal industry.rnThis paper will cover the decision process in selecting the dewatering equipment and the issues thatrnwill be encountered during the construction and commissioning of the paste thickener.
机译:Clermont煤矿是一个新矿,位于Bowen盆地的西部边缘,毗邻Clermont镇。该煤矿归克莱蒙煤炭合资公司(CCJV)所有,全面开发后将产生12 Mt / a的动力煤产品。该矿正作为替代Blair AtholrnCoal合资企业(BACJV)拥有的Blair Athol煤矿(Blair Athol)的替代品而开发。这两个项目的大股东和运营商都是澳大利亚的力拓·澳大利亚煤炭公司(RTCA)。rn过度的覆盖物正在通过卡车和铁锹露天开采作业利用地上破碎和输送(IPCC)系统进行剥离。煤炭的开采将是卡车和铁锹露天开采。很大一部分煤炭原位灰分不到10%,而且大的煤层厚度允许开采时很少或没有稀释度。这意味着大多数煤粉的大小和堆放简单。需要300 t / h的选煤厂(CPP)处理大约10%的Minern(ROM)煤,以确保满足产品规格。该CPP使用致密的中型旋风除尘器处理粗煤部分(-50 mm + 2 mm),并螺旋处理细煤部分(-2 mm + rn0.1 mm),而未处理粘泥(-0.1 mm)并送出在可行性研究阶段,所有废品都要联合处置。共处置涉及将所有CPP废料一起泵送。该联合处置每年将需要约636 ML的废水。最初的地下水研究报告说,这种水可以从地下来源获得。进一步的调查表明这是不正确的,因此必须采用一种新的原理。研究了许多技术来对次品进行脱水和处理,最终选择的是多斜率排水和冲洗筛网,对粗料进行脱水,即高频筛网。 Clermont CPP将是煤炭工业中第一个新建糊状增稠剂的绿地。rn本文将介绍选择脱水设备的决策过程以及相关问题在浆糊增稠剂的建造和调试过程中会遇到这种情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号