CONTINUING A LEGACY OF LARGE-DIAMETER HARD ROCK TUNNELING IN CHICAGO—THE DES PLAINES INFLOW TUNNEL

机译:继续在芝加哥进行大直径硬岩隧道掘进工作— DES平原流入隧道

获取原文
获取原文并翻译 | 示例

摘要

The Metropolitan Water Reclamation District of Greater Chicago’s Des Plaines InflowrnTunnel will provide direct conveyance of 317 cubic meters per second (11,200 cubicrnfeet per second) of water from the Des Plaines Tunnel System to the McCook Reservoir.rnThe project will alleviate a bottleneck in the Tunnel and Reservoir Plan (TARP) systemrnby creating a second major tunnel connection to the 38 billion liter (10 billion gallon)rnMcCook Reservoir. The 1.6 kilometer (1 mile) long, 6.1 meter (20 foot) diameter hardrnrock tunnel will include live connections to the existing Des Plaines Tunnel System andrnto the operating McCook Reservoir as well as a gate shaft and an energy dissipationrnstructure in the reservoir with low clearance crossings of other existing TARP tunnels.rnThe project will bid for construction in mid-2015.
机译:大芝加哥的德斯普兰斯大进水隧道的大都市水回收区将提供每秒317立方米(每秒11200立方英尺)的水从德斯普兰斯隧道系统直接输送到麦库克水库。该项目将缓解隧道和水道的瓶颈。通过建立与380亿升(100亿加仑)rnMcCook水库的第二条主要隧道连接,进行水库计划(TARP)系统。全长1.6公里(1英里),直径6.1米(20英尺)的硬岩隧道将包括与现有的Des Plaines隧道系统和运营中的麦库克水库的实时连接,以及水库中的闸门竖井和低消能结构该项目将在2015年中期竞标建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号