首页> 外文会议>Proceedings of the fourth Yangtze forum >Practice and Thoughts on the Submerged Dike Project for Adjusting and Controlling Function in Lower Reach of the Yangtze River
【24h】

Practice and Thoughts on the Submerged Dike Project for Adjusting and Controlling Function in Lower Reach of the Yangtze River

机译:长江下游堤防调控功能的实践与思考。

获取原文
获取原文并翻译 | 示例

摘要

This paper briefly introduces the process of construction and operation conditions about submerged plastic-pillow dam in left branch at Hechang island of Zhenyang reach in Yangtze River. The experience and lessons of practice was summarized systematically about submerged dam. Innovation about the darn was analyzed in detail to control the river regime in branched river of the middle and lower reaches of the Yangtze River.
机译:简要介绍了长江镇阳河合岛左支塑料枕式坝的施工过程和运行条件。系统地总结了沉水坝的实践经验和教训。详细分析了织补的创新,以控制长江中下游支流的河道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号