首页> 外文会议>Yangtze forum >Practice and Thoughts on the Submerged Dike Project for Adjusting and Controlling Function in Lower Reach of the Yangtze River
【24h】

Practice and Thoughts on the Submerged Dike Project for Adjusting and Controlling Function in Lower Reach of the Yangtze River

机译:长江下游调整和控制功能淹没堤防项目的实践与思考

获取原文

摘要

This paper briefly introduces the process of construction and operation conditions about submerged plastic-pillow dam in left branch at Hechang island of Zhenyang reach in Yangtze River. The experience and lessons of practice was summarized systematically about submerged dam. Innovation about the darn was analyzed in detail to control the river regime in branched river of the middle and lower reaches of the Yangtze River.
机译:本文简要介绍了在长江镇阳滨岛左侧左分支的埋藏塑料枕坝建筑和运作条件的过程。系统的经验和经验教训总结了淹没大坝。详细分析了关于DARN的创新,以控制长江中下游分枝河流的河流制度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号