首页> 外文会议>Proceedings of 2010 international symposium on construction economy and management. >Study on the Constructional Engineering Disputes and Settlement Mechanism
【24h】

Study on the Constructional Engineering Disputes and Settlement Mechanism

机译:建筑工程纠纷与解决机制研究

获取原文
获取原文并翻译 | 示例

摘要

With the booming development of the real estate, a tremendous number of constructional engineering disputes emerge.As the subject of the dispute involves a much more complicated specific professional and technical issue within a hundred years of industrial experiences, litigation is not the most effective approach. With their respective advantages, FIDIC engineer decision, DRB , DAB and NEC arbitrator system, etc. are being adopted generally in the world to solve the disputes, which can provide beneficial suggestions for the improvement of the construction dispute resolution mechanism in China.
机译:随着房地产业的蓬勃发展,出现了大量的建筑工程纠纷。由于纠纷的主题涉及一百多年的行业经验中涉及更复杂的特定专业技术问题,因此诉讼并不是最有效的方法。 FIDIC的工程师决定,DRB,DAB和NEC仲裁员系统等各有其优点,在世界范围内普遍用于解决纠纷,这可以为改善我国施工纠纷解决机制提供有益的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号