Construction Challenges for an 84-inch Pipeline:TRWD’s Eagle Mountain Connection Project

机译:84英寸管道的建设挑战:TRWD的鹰山连接项目

获取原文
获取原文并翻译 | 示例

摘要

Tarrant Regional Water District (TRWD) supplies raw water to over thirty wholesalerncustomers (approximately 1.6 million people) in ten Texas counties. TRWD’srnexisting raw water supply system includes two major reservoirs in East Texas,rnpipelines and pump stations to deliver water from East Texas to Tarrant County, thernWest Fork reservoirs, two terminal storage lakes in Tarrant County, and the BenbrookrnConnection, which delivers East Texas water to the southwest side of Fort Worth.rnTRWD has recently completed construction of the $140 million Eagle MountainrnConnection Project that allows TRWD to pump water from their East TexasrnReservoirs to Eagle Mountain Lake. The project includes 20 miles of 96-inch and 84-rninch pipeline, the 430 MGD Rolling Hills Pump Station (expandable to 630 MGD),rnthe 230 MGD Benbrook Booster Pump Station (expandable to 350 MGD), a 120-rnmillion-gallon balancing reservoir, and a number of other required facilities.rnThe 96/84-inch Eagle Mountain Pipeline runs from Benbrook Lake to EaglernMountain Lake. The pipeline contractor was faced with several challenges duringrnconstruction of the project. The paper will describe in detail two such challenges, onernplanned and one surprise, and the innovative techniques used by the engineer andrncontractor to overcome these challenges.rnThe first challenge was the installation of 700 feet of subaqueous pipe and an outletrnstructure in Eagle Mountain Lake. The pipe was installed in an underwater trenchrnand backfilled with coarse gravel. The Contractor used an innovative cable system torninstall the pipe. The outlet structure consisted of a prefabricated steel box with an Sshapernpipe that was set on H-piles and given concrete ballast for thrust restraint.rnThe second challenge was an unforeseen site condition consisting of a largernunderground marsh consisting of highly saturated, extremely loose silty sands and
机译:塔兰特地区水区(TRWD)为德克萨斯州10个县的30多个批发客户(约160万人)提供原水。 TRWD现有的原水供应系统包括东得克萨斯州的两个主要水库,将东得克萨斯州的水输送到塔兰特县的管线和泵站,西叉水库,塔兰特县的两个终端储水湖以及向东得克萨斯州供水的BenbrookrnConnection TRWD最近完成了耗资1.4亿美元的Eagle MountainrnConnection项目的建设,该项目使TRWD将水从其东得克萨斯州水库泵送至Eagle Mountain Lake。该项目包括20英里长的96英寸和84英寸长的管道,430 MGD的Rolling Hills泵站(可扩展至630 MGD),230 MGD的Benbrook增压泵站(可扩展至350 MGD),120亿加仑的平衡96/84英寸的Eagle Mountain Pipeline从本布鲁克湖一直延伸到伊格尔恩山湖。在项目建设过程中,管道承包商面临着若干挑战。本文将详细描述两个这样的挑战,即计划内的挑战和一个惊喜,以及工程师和承包商使用的创新技术来克服这些挑战。第一个挑战是在Eagle Mountain Lake中安装7​​00英尺的水下管道和出口结构。该管道被安装在水下沟渠中,并用粗砾石回填。承包商使用了创新的电缆系统来拆卸管道。出口结构包括一个预制的钢制箱体,该钢制箱体带有一个安装在H形桩上的Sshapernpipe管道,并采用混凝土压舱物来抑制推力。第二个挑战是不可预见的现场条件,该地下条件包括一个较大的地下沼泽,该地下沼泽由高度饱和,极松散的粉砂和

著录项

  • 来源
  • 会议地点 San Diego CA(US);San Diego CA(US)
  • 作者单位

    Water Resources, Freese and Nichols, Inc., 4055 InternationalrnPlaza, Suite 200, Fort Worth, TX 76109 phone 817-735-7315 ach@freese.com;

    rnWater Resources, Freese and Nichols, Inc., 4055 International Plaza,rnSuite 200, Fort Worth, TX 76109 phone 817-735-7323 rlg@freese.com;

    rnWater Resources, Freese and Nichols, Inc., 4055rnInternational Plaza, Suite 200, Fort Worth, TX 76109 phone 817-735-7335 rncne@freese.com;

    rnTarrant Regional Water District, 800 E. NorthsidernDrive, Fort Worth, TX 76102 phone 817-335-2491 dmarshall@trwd.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号