Performance of the Construction Manager at Risk (CMAR) Delivery Method Applied to Pipeline Construction Projects.

机译:应用于管道建设项目的施工经理风险(CMAR)交付方法的绩效。

获取原文
获取原文并翻译 | 示例

摘要

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as Construction Manager at Risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied.;The dissertation fills this gap in knowledge by performing the first quantitative analysis of CMAR performance on pipeline engineering and construction projects. This study's two research objectives are: (1) Develop a CMAR baseline of commonly measured project performance metrics, (2) Statistically compare the cost and schedule performance of CMAR to that of the traditional DBB delivery method.;A thorough literature review led to the development of a data collection survey used in conjunction with structured interviews to gather qualitative and quantitative performance data from 66 completed water and wastewater pipeline projects. Performance data analysis was conducted to provide performance benchmarks for CMAR projects and to compare the performance of CMAR and DBB.;This study provides the first CMAR performance benchmark for pipeline engineering and construction projects. The results span across seven metrics in four performance areas (cost, schedule, project change, and communication). Pipeline projects delivered using CMAR have a median cost and schedule growth of -5% and 5.10%, respectively. These results are significantly improved from DBB baseline performance shown in other industries. To verify this, a statistical analysis was done to compare the cost and schedule performance of CMAR to similar DBB pipeline projects. The results show that CMAR pipeline projects are being delivered with 6.5% less cost growth and with 12.5% less schedule growth than similar DBB projects, providing owners with increased certainty when delivering their pipeline projects.
机译:美国的许多自来水和废水管线都已接近使用寿命。在接下来的几十年中,需要大量的再投资来替换或修复水和废水的基础设施。当前,用于输送水和废水管道工程和建设项目的传统方法是“设计—投标—建造”(DBB)。传统的DBB交付系统是顺序的低集成过程,并且可能导致利益相关者之间的效率低下和不利关系。引入了替代项目交付方法(APDM),例如风险中的施工经理(CMAR),以增加利益相关者的整合并最终提高项目绩效。 CMAR项目绩效影响已在水平和垂直建筑行业中进行了研究。然而,尚未对CMAR项目在管道工程和建筑行业中的绩效进行定量研究。本文通过对CMAR在管道工程和建筑项目中的绩效进行首次定量分析,填补了这一知识空白。这项研究的两个研究目标是:(1)制定常用的项目绩效指标的CMAR基线;(2)统计比较CMAR与传统DBB交付方法的成本和进度绩效。开发数据收集调查,并与结构化访谈结合使用,以收集来自66个已完成的自来水和废水管道项目的定性和定量绩效数据。进行了性能数据分析,以提供CMAR项目的性能基准并比较CMAR和DBB的性能。本研究为管道工程和建筑项目提供了第一个CMAR性能基准。结果跨越四个绩效领域(成本,进度,项目变更和沟通)中的七个指标。使用CMAR交付的管道项目的平均成本和进度增长分别为-5%和5.10%。与其他行业中显示的DBB基准性能相比,这些结果得到了显着改善。为了验证这一点,进行了统计分析,以比较CMAR与类似的DBB管道项目的成本和进度绩效。结果表明,与类似的DBB项目相比,CMAR管道项目的交付成本降低了6.5%,进度进度减少了12.5%,为业主交付管道项目提供了更大的确定性。

著录项

  • 作者

    Francom, Tober C.;

  • 作者单位

    Arizona State University.;

  • 授予单位 Arizona State University.;
  • 学科 Civil engineering.
  • 学位 Ph.D.
  • 年度 2015
  • 页码 138 p.
  • 总页数 138
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号