首页> 外文会议>North American tunneling 2014 proceedings >Achieving Fast EPB Advance in Mixed Ground:A Study of Contributing Factors
【24h】

Achieving Fast EPB Advance in Mixed Ground:A Study of Contributing Factors

机译:在混合地中实现快速EPB推进:影响因素的研究

获取原文
获取原文并翻译 | 示例

摘要

Earth Pressure Balance (EPB) tunneling in mixed ground conditions is a challenging prospect,rnas it often includes excavation in boulder fields, sections of rock, and/or sticky clay, under high waterrnpressure or changing water pressure. Maintaining a rapid advance rate in such conditions is a function ofrnmany factors—from adequate cutting tools to cutterhead design, pre-planning and execution of an appropriaternground conditioning regime as well as proper maintenance and operation of the TBM. This paper will analyzernrecent record-breaking and high-performing projects seeking to identify factors that contribute to fast machinernadvance. These factors will then be discussed and an effort made to form simple, high level guidelines forrnoptimal TBM excavation in mixed ground conditions.
机译:混合地面条件下的土压平衡(EPB)隧道是一个充满挑战的前景,它经常包括在高水压或变化的水压下在巨石场,岩石段和/或黏土中开挖。在这样的条件下保持快速的前进速度取决于许多因素-从适当的切削工具到刀盘设计,适当的地面调节方案的预计划和执行以及TBM的正确维护和操作。本文将分析最近的破记录和高性能项目,以找出有助于快速机器推进的因素。然后将讨论这些因素,并努力形成简单,高水平的指导方针,以在混合地面条件下进行最佳的TBM开挖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号