Project Delivery Strategy for Major Transportation Projects in Los Angeles

机译:洛杉矶主要交通项目的项目交付策略

获取原文
获取原文并翻译 | 示例

摘要

Measure R, which was passed on November 05, 2008 provides $40 billion over the nextrn30 years with funds being used for both direct funding and as collateral for long term bonds to be spent onrnprojects in Los Angeles County, including major new rail transit and highway tunnels. Metro has recentlyrnused a successful combination of traditional and alternative delivery methods on major transportation projects,rnincluding the I-405 freeway widening, Metro Gold Line Eastside Light Rail Extension and Orange Line BusrnRapid Transit projects. The paper reviews the project delivery methods used to date on projects and shares thernrationale for the selection of the design build (DB) procurement strategy being used for the delivery of thernCrenshaw LAX Transit Corridor, Regional Connector Transit Corridor and Purple Line Extension projects.rnThis delivery method was influenced by a commitment to accelerate the overall delivery schedule, facilitaternlocal job creation, improve the quality of life for the region, and was based upon consideration of methodsrnused by other transit agencies and the regulatory framework of options available to the Agency for thesernthree underground construction projects. The paper also explains how the approach has maintained control ofrnkey underground construction requirements for the safe and efficient construction and operation, adoption ofrnappropriate standardized approaches, while allowing freedom for the design builder to provide market basedrnintegrated solutions.
机译:于2008年11月5日通过的Measure R在接下来的30年中提供了400亿美元的资金,这些资金既用于直接融资,又用作长期债券的抵押品,用于洛杉矶县的项目,包括主要的新铁路运输和公路隧道。麦德龙最近在大型交通项目中成功地结合了传统和替代交付方式,包括I-405高速公路拓宽,麦德金线东边轻轨扩建和奥兰治线公共汽车快速运输项目。本文回顾了迄今为止在项目上使用的项目交付方式,并分享了选择用于交付Crenshaw LAX过境走廊,区域连接器过境走廊和Purple Line Extension项目的设计建造(DB)采购策略的成本。该方法受到致力于加快总体交付进度,促进当地就业机会创造,改善该地区生活质量的承诺的影响,并且是基于对其他过境机构使用的方法以及该机构对地下三层可用选项的监管框架的考虑建设项目。本文还解释了该方法如何保持对地下关键施工要求的控制,以确保安全有效的施工和运营,采用适当的标准化方法,同时允许设计建造者自由地提供基于市场的集成解决方案。

著录项

  • 来源
  • 会议地点 Los Angeles CA(US)
  • 作者

    K.N. Murthy; Matthew Crow;

  • 作者单位

    Los Angeles County Metropolitan Transportation Authority;

    Los Angeles County Metropolitan Transportation Authority;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号