首页> 外文期刊>Railway track and structures >Los Angeles Metro advances two major rail projects
【24h】

Los Angeles Metro advances two major rail projects

机译:洛杉矶地铁推进两项重大铁路项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Los Angeles County Metropolitan Transportation Authority (Metro) Board of Directors approved the Draft Environmental Impact Statement/Report (EIS/R) for the Westside Subway Extension and Regional Connector projects, clearing the way for both projects to enter final environmental review and preliminary engineering. In approving the environmental drafts, the Board also approved Metro staff recommendations for the Locally Preferred Alternatives-the routes the projects would take through their respective project areas.
机译:洛杉矶县城市交通管理局(Metro)董事会批准了西区地铁扩建和区域连接器项目的环境影响报告书(EIS / R),为这两个项目进入最终的环境审查和初步工程扫清了道路。在批准环境草案时,董事会还批准了地铁工作人员针对当地首选方案的建议,即项目将通过其各自的项目区域的路线。

著录项

  • 来源
    《Railway track and structures》 |2010年第12期|p. 5-6|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号