Project Delivery Strategy for Major Transportation Projects in Los Angeles

机译:洛杉矶重大交通工程的项目交付策略

获取原文

摘要

Measure R, which was passed on November 05, 2008 provides $40 billion over the next 30 years with funds being used for both direct funding and as collateral for long term bonds to be spent on projects in Los Angeles County, including major new rail transit and highway tunnels. Metro has recently used a successful combination of traditional and alternative delivery methods on major transportation projects, including the 1-405 freeway widening, Metro Gold Line Eastside Light Rail Extension and Orange Line Bus Rapid Transit projects. The paper reviews the project delivery methods used to date on projects and shares the rationale for the selection of the design build (DB) procurement strategy being used for the delivery of the Crenshaw LAX Transit Corridor, Regional Connector Transit Corridor and Purple Line Extension projects. This delivery method was influenced by a commitment to accelerate the overall delivery schedule, facilitate local job creation, improve the quality of life for the region, and was based upon consideration of methods used by other transit agencies and the regulatory framework of options available to the Agency for these three underground construction projects. The paper also explains how the approach has maintained control of key underground construction requirements for the safe and efficient construction and operation, adoption of appropriate standardized approaches, while allowing freedom for the design builder to provide market based integrated solutions.
机译:2008年11月5日通过的措施R提供了4000亿美元,在未来30年内,用于直接资金和长期债券的抵押品在洛杉矶县的项目中,包括新的新铁路运输和公路隧道。地铁最近在主要交通工程中使用了传统和替代交付方法的成功组合,包括1-405高速公路扩大,地铁金线Eastside轻轨延伸和橙线总线快速运输项目。本文审查了迄今为止迄今为止的项目交付方法,并分享了选择设计的理由(DB)采购策略用于交付Crenshaw Lax Transit走廊,区域连接器过境走廊和紫线扩展项目。这种送货方式受到加速整体交货时间表的承诺的影响,促进当地就业机会,提高该地区的生活质量,并基于考虑其他运输机构使用的方法和可供选择的期权监管框架这三个地下建设项目的机构。本文还介绍了该方法如何维持对安全有效的建设和运营的关键地下施工要求的控制,采用适当的标准化方法,同时允许设计建设者自由提供基于市场的集成解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号