首页> 外文会议>North American tunneling 2012 proceedings >Design Aspects of the Underground Line U5 in Berlin: Closing the Gap Between the Stations Alexanderplatz and Brandenburger Tor
【24h】

Design Aspects of the Underground Line U5 in Berlin: Closing the Gap Between the Stations Alexanderplatz and Brandenburger Tor

机译:柏林地铁U5线的设计方面:缩小亚历山大广场站和勃兰登堡门站之间的差距

获取原文
获取原文并翻译 | 示例

摘要

The existing U5 underground line in Berlin currently ends at Alexanderplatz station in Berlin-rnMitte. It is planned to close a gap of approximately 2.2km in the section between the existing tunnels at RotesrnRathaus and Brandenburger Tor station. The line is set to run through downtown from the new Rotes Rathausrnstation to be built below the Spree, underneath the future Berlin Palace and the Spree Canal, and along Unterrnden Linden to Brandenburger Tor. The line includes three new stations (Rotes Rathaus, Museumsinsel andrnUnter den Linden). Construction is scheduled to commence in summer 2012.rnTwo parallel tunnels each approximately 1.6km long are to be built using a slurry pressure balanced TBM.rnThe passage under the retaining walls of the banks of the river Spree, integration with the construction of thernfuture Berlin Palace, and the link to the existing Brandenburger Tor station present major challenges in termsrnof the design and execution of the shield tunneling.
机译:柏林现有的U5地铁线目前在柏林rnMitte的亚历山大广场站结束。计划在RotesrnRathaus和Brandenburger Tor站的现有隧道之间缩小约2.2公里的距离。该线路将从新的Rotes Rathausrnstation穿过市区,该建筑物将建在施普雷下方,在未来的柏林皇宫和施普雷运河下方,然后沿着Unterrnden Linden到Brandenburger Tor。该生产线包括三个新的车站(Rotes Rathaus,Museumsinsel和rnUnder den Linden)。计划于2012年夏季开始施工。rn将使用泥浆压力平衡的TBM建造两条长度约1.6 km的平行隧道。rn施普雷河两岸挡土墙下的通道与柏林宫的建设融为一体以及与现有勃兰登堡门(Brandenburger Tor)站的连接,对盾构隧道的设计和实施提出了重大挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号