首页> 外文会议>New advances in geotechnical engineering >MODEL TESTS AND NUMERICAL SIMULATIONS OF TUNNELING CONSIDERING EXISTING BUILDING AND TUNNEL
【24h】

MODEL TESTS AND NUMERICAL SIMULATIONS OF TUNNELING CONSIDERING EXISTING BUILDING AND TUNNEL

机译:考虑现有建筑物和隧道的隧道模型测试和数值模拟

获取原文
获取原文并翻译 | 示例

摘要

The behavior of the ground during tunnel excavation is usually investigated conducting model tests where absolute displacement is applied in the boundary of the tunnel periphery or stress around the excavation face is applied.In this research,a new device has been developed not only for applying inner displacement of tunnel but also for allowing the movements of the tunnel itself with satisfying the equilibrium between tunnel and the surrounding ground.With the new device,model tests of tunnel excavation considering an existing tunnel and an existing building are carried out.Non-linear finite element analyses corresponding to the model tests are also conducted using FEMtij-2D software where elastoplastic subloading tij model is used as a constitutive model of soil.It is revealed that in the ground with existing (preceding) tunnel,the earth pressure distribution around the preceding and following tunnels,and ground movements during tunnel excavation depend on the distance and position between the twin tunnels.It is also found that there is a significant effect of tunneling on the existing foundation of building even the tunnel is constructed in deep underground.The numerical analyses perfectly capture the results of the model test in both conditions.
机译:通常通过进行模型测试来研究隧道开挖过程中的地层行为,其中在隧道外围边界施加绝对位移或在开挖面周围施加应力。在这项研究中,开发了一种新的设备,不仅用于内部利用这种新装置,在考虑现有隧道和现有建筑物的情况下,对隧道开挖进行了模型试验。非线性有限元法可满足隧道与周围地面之间的平衡。还使用FEMtij-2D软件进行了与模型试验相对应的元素分析,其中弹塑性亚载tij模型被用作土壤的本构模型。研究表明,在存在(先前)隧道的地下,前缘周围的土压力分布以及后续的隧道,隧道开挖期间的地面运动取决于距离和位置b研究还发现,即使在地下深层中建造隧道,隧道对现有建筑物基础也有显着影响。数值分析完美地捕捉了两种情况下的模型测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号