The Value of Early Geotechnical Assessment in Mine Planning

机译:早期岩土评估在矿山规划中的价值

获取原文
获取原文并翻译 | 示例

摘要

Valuable data for geotechnical interpretation and integration into effectivernAustralian underground mine planning may often be available, yet is notrnalways fully appreciated or utilised, particularly in the early stages ofrnmine planning or in due diligence studies. There may be considerablernbenefits associated with early prioritisation of geotechnical evaluationrnand impact on mine planning.rnUnidentified, misinterpreted, or ill-defined adverse geological andrnrelated geotechnical resource characteristics can pose significant businessrnrisk to underground coal projects and operations. Preliminary resourcerndefinition in the early conceptual mine planning stages attributesrnsignificant focus (entirely warranted) on resource quality and structuralrngeology constraints. Yet detailed geotechnical data analysis andrninterpretation, which may have a substantial down stream impact andrnsensitivity with respect to future mine planning strategies, at times isrngiven lower priority, or scoped and resourced in the later stages of arnbankable feasibility study. Through extensive mine planning experiencernand observation of downstream process impacts, it has been found therernis often data available for geotechnical analysis that does not readilyrnstand out or is not adequately understood or utilised, available at the earlyrn(conceptual) stages of mine planning. Part of the issue may be thatrnexploration geologists are not necessarily experienced geotechnicalrnengineers and do not necessarily recognise or understand all importantrnparameters. Subject to appropriate application of experiencedrnprofessionals data can be manipulated to provide key geotechnical hazardrnassessment at minimal cost, and provide a framework for understandingrnand optimising the mine planning process.rnAlthough there is no single prescribed strategy for resource evaluationrnfrom a geotechnical perspective, potential business risks and mitigationrnapproaches can and should be adopted at the conceptual mine planningrnstage. There has been a recent focus in the metals industry to provide arnreporting framework for geotechnical classification of mining projects.rnThis paper outlines the strategies and gives examples of key analysesrnadopted in mine planning and discusses the relative merits of adopting arnreporting framework as a tool for geotechnical classification in minernplanning.
机译:用于岩土工程解释并将其整合到有效的澳大利亚地下矿山规划中的有价值数据可能经常可用,但并没有得到人们的充分重视或利用,尤其是在矿山规划的早期阶段或尽职调查研究中。尽早确定岩土工程评估的优先级可能会带来相当大的好处,并会对矿山规划产生影响。未被识别,误解或定义不正确的不利地质及与岩土相关的岩土资源特征可能对地下煤炭项目和运营造成重大商业风险。在概念性矿山规划的早期阶段,对资源的初步定义主要是(完全有理由)关注资源质量和结构地质约束。然而,详细的岩土数据分析和解释可能对未来的矿山规划策略具有重大的下游影响和敏感性,有时其优先级较低,或者在可进行可行性研究的后期进行范围划分和提供资源。通过丰富的矿山规划经验和对下游过程影响的观察,人们发现,在矿山规划的早期(概念)阶段,经常存在无法用于岩土分析的数据,这些数据不易被理解或未被充分理解或利用。问题的一部分可能是勘探地质学家不一定是经验丰富的岩土工程师,也不一定认识或理解所有重要的参数。在适当应用经验丰富的专业人士的情况下,可以操纵数据以最低的成本提供关键的岩土工程危害评估,并为理解和优化矿山规划过程提供框架。在概念性矿山规划阶段可以并且应该采用。金属行业最近一直在为采矿项目的岩土分类提供arnreporting框架。rn本文概述了策略,并给出了采矿规划中采用的关键分析的例子,并讨论了采用arnreporting框架作为岩土分类的工具的相对优点。在矿山规划中。

著录项

  • 来源
  • 会议地点 Brisbane(AU);Brisbane(AU)
  • 作者

    C Hanson; D Thomas; B Gallagher;

  • 作者单位

    IMCrnConsultants Pty Ltd, Level 27, Central Plaza One, 345 Queen Street,rnBrisbane Qld 4000;

    IMC Consultants Pty Ltd,rnLevel 27, Central Plaza One, 345 Queen Street, Brisbane Qld 4000;

    rnIMC Consultants Pty Ltd, Levelrn27, Central Plaza One, 345 Queen Street, Brisbane Qld 4000;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号