Engineering around Manhattan's History to Construct a Cutting-Edge University Building: Excavation Support and Foundations for the 181 Mercer Street Project

机译:曼哈顿历史上的工程建设了一个尖端大学建筑:181亿街区的挖掘支持和基础

获取原文

摘要

New York University's (NYU) 181 Mercer development is a part of NYU's master plan to provide university programming in the historic Greenwich Village neighborhood of New York City. To provide the desired amount of programming space, NYU proposed a 9 to 26 story building with two cellar levels to the lot-lines of a 7,430 square-meter (80,000-square-foot) site. General excavation extended about 10.7 meters (35 feet) below the adjacent streets, and localized excavations for proposed mechanical space, a pool, and caisson caps extended up to 4.6 meters (15 feet) deeper. Past developments on the project site, adjacent streets, and adjacent structures had a paramount impact on below-grade construction, coupled with the site being next to an NYC Landmark District and a landmarked 33-story tower. The proposed cellar levels extended below part of the de-mapped Greene Street which presented many unknowns regarding existing utilities and other buried structures. The north and south sides of the excavation were supported by bracing the foundation walls of the former building that occupied the site and jet-grout-underpinning the walls. Double-channel soldier piles braced by tiebacks were designed to support the east and west perimeters of the excavation. External bracing was designed to be anchored below the mat foundation of the neighboring landmarked tower, to avoid cellars of the neighboring historic buildings, below a subway, and to avoid utilities. Soil-mixing was constructed to support localized excavations for the proposed pile caps, mechanical pits, and pool below the general subgrade that were up to 3.6 meters (12-feet) below groundwater. Excavation support for the new building and new utilities were adjusted as excavation exposed utilities and foundations of the former industrial buildings that occupied the site in the early 20th century. The new 181 Mercer building is supported by drilled caissons socketed into bedrock. The caissons were installed using a down-the-hole hammer with an internal air-flow system. Neighboring structures were monitored throughout excavation and foundation construction to verify activities on the site did not cause adverse effects on the structures.
机译:纽约大学(NYU)181 Mercer Development是NYU总体计划的一部分,为纽约市历史悠久的格林威治村附近提供大学编程。为了提供所需数量的编程空间,NYU提出了9至26个故事的建筑,具有两种酒窖水平,批量为7,430平方米(80,000平方英尺)的位置。一般挖掘在相邻的街道下方约10.7米(35英尺),以及拟议的机械空间,泳池和沉箱盖的局部挖掘延伸到4.6米(15英尺)。在项目现场,相邻的街道和相邻结构上的过去的发展对低于坡度建设的倾向影响,加上了纽约地标区旁边的网站和一个地标33层塔。所提出的地窖水平延长了脱模的绿色街的一部分,展示了关于现有公用事业和其他埋地结构的许多未知数。挖掘的北方和南侧由支撑前建筑的基础墙壁支撑,该建筑物占据现场和喷射灌浆的墙壁。由Tipbacks支撑的双通道士兵桩旨在支持挖掘的东部和西部周边。外部支撑被设计为锚定在邻近地位塔的席位基础之下,以避免邻近历史建筑的酒窖,下面的地铁下方,并避免公用事业。构建土壤混合以支持拟议的桩帽,机械坑和池的局部挖掘,低于地下水的一般路基下方的一般路基上3.6米(12英尺)。新建筑和新公用事业的挖掘支持被调整为挖掘暴露公用事业和前工业建筑的基础,该建筑物在20世纪初占据了该网站。新的181架Mercer建筑被钻孔坐落在基岩中。使用带内部空气流量系统的孔锤安装沉箱。在整个挖掘和基础建设中监测相邻结构,以验证现场的活动并未对结构产生不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号