Start up Problems of Thalys High Speed Operation in the Netherlands

机译:启动荷兰高速运行的问题

获取原文

摘要

After years of preparation, Thalys trains were put in service on the high speed line in the Netherlands on December 13 th 2009. Until that date Thalys had been running on conventional track since 1996. The high speed line allows a reduction of one hour in travel time between Amsterdam and Belgium, but in the first periods punctuality dropped significantly. What were the issues and how were they identified and solved.
机译:经过多年的准备,2009年12月13日在荷兰的高速线上投入使用。直到自1996年以来,在传统的赛道上,该日期已经在常规轨道上运行。高速线路允许减少一个小时的旅行阿姆斯特丹和比利时之间的时间,但在第一个时期的准时显着下降。这些问题是什么以及他们如何确定和解决。