Conduit No. 16 Replacement-A River Tunneled under Your Feet

机译:导管第16号更换 - 一条河流在你的脚下隧道

获取原文

摘要

Denver Water's Conduit No. 16 was completed in 1937 to convey raw water from the Ralston Reservoir to the Moffat Water Treatment Plant. A recent study concluded that the two existing water conduits were approaching the end of their service life and Denver Water elected to replace Conduit No. 16 with a new larger pipeline and abandon the other conduit. Development along the alignment required design and construction of five tunnels to cross three roadways, a major shopping center, and two railroad tracks. Design and construction were complicated by contaminated groundwater, abundant cobbles and boulders, running sand, and deep bedrock. Three charrettes were held with tunneling contractors to discuss challenges and offer solutions to these issues. Design of the new conduit occurred between 2013 and 2018, and was complicated by an 18-month hiatus from late 2014. The hiatus was due to Denver Water studying and eventually deciding to build a new water treatment plant at the Ralston site. This resulted in Conduit No. 16 needing to be switched from a raw water line to a treated water line. In late 2017, work began on construction of the five tunnels and about one mile of open cut work.
机译:丹佛水的导管第16号于1937年完成,以将Ralston水库从Ralston水库输送到Moffat水处理厂。最近的一项研究得出结论,这两个现有的水管正在接近他们的使用寿命和丹佛水的结束,并选择用新的较大管道取代第16号导管并放弃其他导管。开发沿着对齐所需的设计和建造五个隧道,跨越三道路,一个主要的购物中心和两个铁轨。设计和施工是污染的地下水,丰富的鹅卵石和巨石,跑沙和深层基岩复杂。隧道承包商举办了三名Charrettes,讨论挑战并提供这些问题的解决方案。 2013年至2018年之间发生了新导管的设计,从2014年底开始了18个月的中断复杂。中断是由于丹佛的水学习,最终决定在Ralston网站上建造新的水处理厂。这导致了需要从原水管线切换到处理过的水管线的导管16. 2017年底,工作开始建设五个隧道,大约一英里的开放式工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号