North American Tunneling Industry Firsts in the Midwest: The Blacksnake Creek Stormwater Separation Improvement Tunnel

机译:北美隧道行业首先在中西部:Blacksnake Creek雨水分离改善隧道

获取原文

摘要

The Blacksnake Creek Stormwater Separation Improvement Tunnel intercepts Blacksnake Creek stream and stormwater flows up to 18 cubic meters per second (650 cfs) from the City's combined sewer system and redirects the flows to the Missouri River through a dedicated stormwater conveyance tunnel approximately 2.0 kilometers (1.2 miles) in length and 2.7 meters (9.0 feet) in finished diameter. Mixed faced conditions of soil and shale bedrock along portions of the tunnel alignment required excavation and initial support methods capable of transitioning between the varying ground conditions. An Earth Pressure Balance Machine (EPBM) was selected to provide better control over the excavation face and reduce risks associated with settlement and groundwater inflows. The particular EPBM used was designed by Lovsuns and manufactured in China by Lovsuns' parent company, their first EPBM delivered to the North American tunneling industry. The tunnel was lined with precast concrete segments solely reinforced with macro synthetic fibers (BarChip, Inc. BarChip 54 fibers) in lieu of steel fibers or traditional bar reinforcement, another first for the North American tunneling industry, to comply with the American Iron and Steel provisions of the Contract. The project also includes a baffle drop shaft, a separate shorter tunnel underneath active main line BNSF railroad tracks, and an energy dissipation structure. This paper will focus on the design decisions and lessons learned throughout construction including addressing mixed face ground conditions and groundwater during the single pass tunnel excavation and installation of the precast concrete segmental tunnel lining.
机译:所述黑蛇溪雨水分离的改进隧道截距黑蛇溪流和雨水向上流至每秒18立方米(650个CFS)从市的组合下水道系统和重定向通过专用雨水输送隧道约为2.0公里流向密苏里河(1.2在长度英里),在成品直径2.7米(9.0英尺)。土壤和页岩基岩的混合面条件沿隧道对准所需的挖掘部分,并且能够在不同的地基条件之间的转变的初始支持方法。一个土压平衡机(EPBM)被选中来提供在开挖面更好地控制和减少沉降和地下水流入带来的风险。使用被Lovsuns通过Lovsuns的母公司在中国设计和制造的特定EPBM,他们的第一个EPBM交付给北美隧道行业。该隧道用代替钢纤维或传统的酒吧加固,另一首为北美隧道行业的宏观合成纤维(BarChip公司BarChip 54克纤维),以符合美国钢铁仅钢筋预制混凝土砌块内衬该合同的规定。该项目还包括一个挡板下降轴,活性主线BNSF铁轨下方的单独的短隧道,和能量耗散结构。本文将着眼于整个建筑包括单程隧道开挖及安装预制混凝土管隧道衬砌过程中解决混合面地层条件和地下水学到的设计决策和教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号