首页> 外文会议>Rapid Excavation and Tunneling Conference >South Hartford Conveyance and Storage Tunnel Project-Drop and Vent Shaft Construction
【24h】

South Hartford Conveyance and Storage Tunnel Project-Drop and Vent Shaft Construction

机译:南方哈特福德运输和储存隧道投影滴和通风轴施工

获取原文

摘要

The South Hartford Conveyance and Storage Tunnel (SHCST) is a major component of the Hartford Metropolitan District's Clean Water Project (CWP). The tunnel will capture and store Combined Sewer Overflows (CSO) from the southern portion of Hartford, CT and Sanitary Sewer Overflows (SSO) from West Hartford and Newington, CT. The project includes 21,800 ft of 18 ft final diameter tunnel, several miles of consolidation sewers, eight hydraulic drop structures and a 50 mgd tunnel dewatering station. This paper describes the challenges and methods used to construct the drop and vent shafts.
机译:南哈特福德运输和储存隧道(SHCST)是哈特福德大都市区的清洁水项目(CWP)的主要部分。隧道将捕获并将组合的下水道溢出(CSO)从Hartford,CT和卫生下水道溢出(SSO)从West Hartford和Newington,CT溢出。该项目包括21,800英尺的18英尺的最终直径隧道,几英里的整齐下水道,八个液压下降结构和50 Mgd隧道脱水站。本文介绍了用于构建滴轴和排气轴的挑战和方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号