首页> 外文会议>Rapid Excavation and Tunneling Conference >CASE HISTORY OF THE ORME STREET COMBINED TRUNK RELIEF SEWER PHASE III
【24h】

CASE HISTORY OF THE ORME STREET COMBINED TRUNK RELIEF SEWER PHASE III

机译:Orme Street组合中继浮雕下水道阶段III的案例历史

获取原文

摘要

Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7 locations along a 970 m alignment in downtown Atlanta. The alignment was enveloped by adjacent structures and utilities. The project was constructed below the groundwater table through compressible residual soil, rock and mixed face using a myriad of construction techniques, including compressed air NATM and jet grouting. Numerous design and alignment changes and accommodations for existing utilities and conditions were made during construction. The authors believe this to be the first NATM project in North America utilizing compressed air tunneling.
机译:Orme Street组合中继释放下水道项目的第三阶段将两个现有的2.13米直径的组合下水道连接到新的3.66米直径的沿亚特兰大市中心的970米对齐的7个位置。该对准由相邻的结构和公用事业包围。该项目通过使用无数的施工技术,通过可压缩的残留土,岩石和混合面构造地下水位,包括压缩空气NATM和喷射灌浆。在施工期间制定了许多设计和对准变化和现有公用事业和条件的住宿。作者认为,这是利用压缩空气隧道的北美第一个北美项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号