Management approach for NASA's Earth Venture-1 (EV-1) airborne science investigations

机译:NASA的Earth Venture-1(EV-1)机载科学调查的管理方法

获取原文
获取原文并翻译 | 示例

摘要

The Earth System Science Pathfinder (ESSP) Program Office (PO) is responsible for programmatic management of National Aeronautics and Space Administration's (NASA) Science Mission Directorate's (SMD) Earth Venture (EV) missions. EV is composed of both orbital and suborbital Earth science missions. The first of the Earth Venture missions is EV-1, which are Principal Investigator-led, temporally-sustained, suborbital (airborne) science investigations cost-capped at $30M each over five years. Traditional orbital procedures, processes and standards used to manage previous ESSP missions, while effective, are disproportionally comprehensive for suborbital missions. Conversely, existing airborne practices are primarily intended for smaller, temporally shorter investigations, and traditionally managed directly by a program scientist as opposed to a program office such as ESSP. In 2010, ESSP crafted a management approach for the successful implementation of the EV-1 missions within the constructs of current governance models. NASA Research and Technology Program and Project Management Requirements form the foundation of the approach for EV-1. Additionally, requirements from other existing NASA Procedural Requirements (NPRs), systems engineering guidance and management handbooks were adapted to manage programmatic, technical, schedule, cost elements and risk. As the EV-1 missions are nearly at the end of their successful execution and project lifecycle and the submission deadline of the next mission proposals near, the ESSP PO is taking the lessons learned and updated the programmatic management approach for all future Earth Venture Suborbital (EVS) missions for an even more flexible and streamlined management approach.
机译:地球系统科学探路者(ESSP)计划办公室(PO)负责国家航空航天局(NASA)科学任务局(SMD)的地球冒险(EV)任务的计划管理。 EV由轨道和亚轨道地球科学任务组成。 Earth Venture的第一个任务是EV-1,这是由首席研究人员领导,暂时维持的,亚轨道(机载)科学调查的费用,五年内每次上限为3,000万美元。用于管理先前的ESSP任务的传统轨道程序,过程和标准虽然有效,但对于亚轨道任务而言却不成比例地全面。相反,现有的空中实践主要是为了进行较小的,时间较短的调查,传统上是由计划科学家直接管理,而不是像ESSP这样的计划办公室。在2010年,ESSP设计了一种管理方法,以在当前治理模型的结构内成功执行EV-1任务。 NASA研究与技术计划和项目管理要求构成了EV-1方法的基础。此外,对来自其他现有NASA程序要求(NPR)的要求,系统工程指导和管理手册进行了调整,以管理计划,技术,进度,成本要素和风险。由于EV-1任务即将完成成功的执行和项目生命周期,并且临近下一个任务建议的提交截止日期临近,因此ESSP PO正在汲取经验教训,并为所有未来的Earth Venture Suborbital( EVS)的使命,以实现更加灵活和简化的管理方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号