首页> 外文会议>International conference on hydropower;Waterpower >Alignment of Costs and Beneficiaries During Relicensing
【24h】

Alignment of Costs and Beneficiaries During Relicensing

机译:减少期间成本和受益人的对准

获取原文

摘要

The hydroelectric facility reli8censing process creates a forum in which stakeholders to the existence and operation of that facility attempt to resolve concerns and/or problems. This forum is open-ended y design, which creates a virtually boundless array of issues that can be introduced into the process. The obligation of performing the resulting studies and any consequential remediation has historically fallen to only one of the stakeholders, the license applicant. An increasingly competitive energy marketplace along with growing awareness of environmental issues creates a natural conflict among stakeholders during the relicensing process. In extreme cases, where project licenses are conditioned such that projects are rendered economically non-viable, there is a risk that some stakeholders are disadvantaged as a result of the outcome of the process.
机译:水力发电机构Reli8Censing进程创造了一个论坛,其中利益相关者对该设施的存在和运作,试图解决关注和/或问题。 该论坛是开放式的Y设计,它创建了一个可以引入过程中的几乎无限的问题。 履行所产生的研究和任何相应的补救措施历史上只落入了许可证申请人的一个利益攸关方。 竞争日益激烈的能源市场以及日益增长的环境问题的认识在重新征求过程中产生了利益相关者的自然冲突。 在极端案例中,如果项目许可证被调节,以使项目在经济上不可行,因此有一些利益相关者因进程结果而处于不利地位的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号