首页> 外文会议>International conference on hydropower;Waterpower'97 >Alignment of Costs and Beneficiaries During Relicensing
【24h】

Alignment of Costs and Beneficiaries During Relicensing

机译:许可期间成本和受益人的统一

获取原文

摘要

The hydroelectric facility reli8censing process creates a forum in which stakeholders to the existence and operation of that facility attempt to resolve concerns and/or problems. This forum is open-ended y design, which creates a virtually boundless array of issues that can be introduced into the process. The obligation of performing the resulting studies and any consequential remediation has historically fallen to only one of the stakeholders, the license applicant. An increasingly competitive energy marketplace along with growing awareness of environmental issues creates a natural conflict among stakeholders during the relicensing process. In extreme cases, where project licenses are conditioned such that projects are rendered economically non-viable, there is a risk that some stakeholders are disadvantaged as a result of the outcome of the process.
机译:水力发电设施的再许可过程创建了一个论坛,在该论坛中,该设施的存在和运营的利益相关者试图解决问题和/或问题。这个论坛是开放式的,它设计了几乎无穷无尽的问题,可以引入到流程中。从历史上讲,进行研究结果和任何相应补救措施的义务仅落在利益相关者之一,即许可申请人中。竞争日益激烈的能源市场,以及对环境问题日益增长的意识,在重新许可过程中在利益相关者之间造成了自然冲突。在极端情况下,如果以项目许可为条件而使项目在经济上不可行,则存在某些利益相关者由于流程的结果而处于不利地位的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号