DEVICES FOR CF SHEET POST-TENSION STRENGTHENING FOR STEEL BRIDGE GIRDER

机译:钢桥梁CF板张力张力的装置

获取原文

摘要

In Japan, 20 tons track load had been adopted for bridge design codes since 1956, and it was upgraded to 25 tons in 1993. Although newly constructed bridges have been designed based on this code, most of the old bridges are still remaining under poor load capacity and are supporting heavy traffic until they would be strengthened. As well known, post-tension strengthening method has mainly been used for concrete bridges. However, this method becomes useful to strengthen existing steel bridges because additional load can be applied to meet the upgraded codes. In the present study, carbon fiber reinforced composites (CFRP) was tried as post-tension strengthening materials. The post-tension load was introduced into bridge girders by newly developed devices to pull and install carbon fiber sheet on the bottom of bridge girders. Then epoxy resin was impregnated into carbon fiber sheet. Finite element analysis has also been carried out to find out the design policy of this post-tension strengthening. With increasing the post-tension load, onset of delamination was expected. The analysis was mainly focused on how to prevent possible delamination at the end of CFRP. One of the smart and cheap way to avoid onset of delamination between CFRP and girder bridge is to suppress opening defection at the end of bonded CFRP by attaching the holding plates. The experimental results are also be presented. It is important to develop devices to introduce post-tension load in the bridge girder. Newly developed devices are also shown in this report.
机译:在日本,自1956年以来,已经采用了20吨轨道装载桥梁设计代码,并于1993年升级至25吨。虽然新建的桥梁已经基于这段代码设计,但大多数旧桥都仍处于不良负载下能力,并支持繁重的交通,直到它们将得到加强。众所周知,张紧后强化方法主要用于混凝土桥梁。然而,这种方法对于加强现有的钢结构变得有用,因为可以应用额外的负载来满足升级的代码。在本研究中,碳纤维增强复合材料(CFRP)被用作张力后强化材料。通过新开发的装置将后张力载入桥梁梁中,以拉动并安装桥梁梁底部的碳纤维板。然后将环氧树脂浸渍到碳纤维片中。还执行了有限元分析,以了解这种紧张后加强的设计政策。随着增加后张力载荷,预期分层的发作。分析主要集中在如何防止CFRP末端可能分层。避免CFRP和梁桥之间分层开始的智能和廉价方式之一是通过附接保持板抑制粘合CFRP结束时的开度偏差。还提供了实验结果。开发设备以在桥梁梁中引入张力后载荷非常重要。本报告中还显示了新开发的设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号