The Dredged Material Management Program is a cooperative interagency program in Washington State for regulating and managing dredged material in Puget Sound,in Grays Harbor/Willapa Bay,and in the Lower Columbia River.Each of the four cooperating agencies(U.S.Army Corps of Engineers, Seattle District(lead agency);U.S.Environmental Protection Agency,Region 10;Washington State Department of Ecology;and Washington State Department of Natural Resources)has jurisdiction over dredging and disposal of dredged material.The effort to develop a new interagency program to manage dredged material began in 1985 in Puget Sound.Called the“Puget Sound Dredged Disposal Analysis” (PSDDA)Study,it was developed over a 4.5 year,two-phased cost shared study for$4.5 million dollars. The study brought the federal and state regulatory and resource agencies,environmental interest groups, and the public together through a consensus process.Two overlapping Environmental Impact Statements developed state-of-the-art evaluation procedures,identified environmentally acceptable disposal sites, and developed site-specific monitoring plans to assess the success of management objectives.In 1995 the interagency model for PSDDA was extended to the coastal Washington estuaries in Grays Harbor and Willapa Bay,and in 1998 to the lower Columbia River.The evaluation procedures developed for these two areas was conceptually patterned after the PSDDA evaluation procedures,with modifications that reflected local hydrodynamic conditions and chemicals of concern.Upon completion of the dredged material management manuals for these three diverse water bodies,the interagency program established to implement them became the“Dredged Material Management Program”. Successful DMMP implementation involves close interagency coordination and consensus on all aspects of dredged material management,including sampling and testing design,sampling plan review and approvals,chemical and biological testing data interpretation,and QA/QC review.The process culminates in a project specific suitability determination memorandum is signed by all four agencies.The DMMP prepares biennial reports documenting all aspects of the program including project testing summaries,testing cost evaluations,program/regulatory processing evaluations,documentation and summaries of disposal site monitoring.A Sediment Management Annual Review Meeting(SMARM)is conducted in the spring of each year to provide feedback to the public on program status and proposed updates to the management plans,while allowing public input.All Documents are available at the web address:http://www.nws.usace.army.mil/PublicMenu/Menu.cfm?sitename=dmmo&pagename=home. Thirteen years of implementation have provided predictability and feedback to the dredging community and resource agencies and public on the environmental acceptability of the DMMP.Implementation has been very successful in Puget Sound and Grays Harbor/Willapa Bay,but still faces some challenges on the lower Columbia River.The DMMP is now working to resolve outstanding sediment management challenges,and to identify and manage dredged material for beneficial uses.
机译:疏浚物资管理计划是华盛顿州的合作机构间计划,用于在Gugs Harbour / Willapa Bay和下哥伦比亚河的Puget Sound中规范和管理疏浚物质。中的四个合作机构(Usarmy工程兵团,西雅图区(潜在机构); Usennironmental Protection Agence,地区10;华盛顿州生态部;和华盛顿州自然资源部)对疏浚和处置的疏浚物质有管辖权。制定新的政府管理疏浚的努力材料始于1985年在Puget Sound.Called“Puget Sound Deled Assovalation分析”(PSDDA)的研究中,它开发了4.5年,两分阶段成本共享研究,以450万美元。该研究将联邦和州监管和资源机构,环境利益集团和公众共同通过共识过程。与世界重叠的环境影响陈述发表了最先进的评估程序,确定了环境可接受的处置网站和开发的网站 - 特价监测计划评估管理目标的成功。1995年PSDDA的间度模型扩展到灰港和威尔拉帕湾的沿海华盛顿河口,并于1998年到下哥伦比亚河。为这两个领域开发的评估程序在PSDDA评估程序后概念性地进行了图案化,反映了当地流体动力学条件和担心化学品的修改。为这三种多样化的水机构完成了疏浚物料管理手册,为实施其实施而设立的间度方案成为“疏浚物资管理计划” “。成功的DMMP实施涉及在疏浚物资管理的各个方面进行近距离间协调和共识,包括采样和测试设计,抽样计划审查和批准,化学和生物学检测数据解释,以及QA / QC评论。该过程在项目特定适用性中达到了高潮确定备忘录由所有四个机构签署。DMMP准备了对该计划的各个方面的双年度报告,包括项目测试摘要,测试成本评估,计划/监管处理评估,文件和处置现场监测的文件和摘要。沉积物管理年度审查会议( SMARM)在每年的春季进行,为公众提供反馈的计划状态,并提出对管理计划的更新,同时允许公共输入。所有文件都可以在Web地址提供:http://www.nws.usace .army.mil / publicmenu / menu.cfm?siteName = DMMO&Pagename = Home。实施十三年的实施为疏浚社区和资源机构提供了可预测性和反馈,并公开了DMMP的环境可接受性。普吉特声音和灰色港口/威利拉帕湾非常成功,但仍面临着哥伦比亚的挑战河流,DMMP现正致力于解决出色的沉积物管理挑战,并识别和管理疏浚物资以获得有益用途。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号