首页> 外文会议>International Conference on Operations Research Operations Research >The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy
【24h】

The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy

机译:经济地段和供应调度问题在两个权力下的政策下

获取原文

摘要

The paper presents a new problem class, the Economic Lot and Supply Scheduling Problem (ELSSP). The ELSSP deals with the simultaneous vehicle routing and production planning and is an extension of the well known Economic Lot Scheduling Problem (ELSP). To solve the described problem the junction point method of Yao and Elmaghraby (2001) for the solution of the ELSP under a power-of-two policy is modified and extended in order to consider the vehicle routing problem caused by the deliveries of the input materials.
机译:本文提出了一个新的问题课,经济点和供应调度问题(ELSSP)。 ELSSP涉及同步车辆路由和生产计划,是众所周知的经济调度问题(ELSP)的延伸。为了解决所描述的问题,修改并扩展了yao和elmaghraby(2001)对ELSP解决方案的连接点方法进行了修改和扩展,以考虑由输入材料的交付引起的车辆路由问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号