【24h】

Safety in the III Valico tunnels

机译:III Valico隧道的安全

获取原文

摘要

The Genoa-Milan High-Speed Railway Line (III Valico di Giovi) is characterized by the presence of several tunnel sections, including the double-barreled Valico tunnel with a length of 27 km (not including interconnections, making it one of the longest galleries in the national territory), and the Serravalle tunnel with a length of 7 km. In recent years the issue of tunnel safety has been the subject of specific laws, both at the national level, with Ministerial Decree 28.10.2005 on Safety of Railway Tunnels, and at the European level through Council Decision 2008/163/EC of 20 December 2007 on the technical specifications of interoperability relating to Safety of Railway Tunnels in the trans-European conventional rail system and to high-speed referred to as Technical Specifications for Interoperability or TSI. The III Valico di Giovi is part of the European Genoa-Rotterdam corridor and, therefore, falls within the before mentioned TSI introduced following the approval of the final design in 2005. The safety design, based on in-depth analyses carried out by means of fire and exodus models and probabilistic risk analysis, has led to the definition of the functional layout and performance specifications of safety systems, and the development of a final plan that is among the most advanced in Europe from an operational safety point of view.
机译:热那亚 - 米兰高速铁路线(III Valico di Giovi)的特点是存在几个隧道部分,包括双桶式ValiCo隧道,长度为27公里(不包括互连,使其成为最长的画廊之一在国家领土,塞拉瓦尔隧道长度为7公里。近年来,隧道安全问题一直是国家一级的特定法律主题,在国立一级的部长法令28.10.2005就铁路隧道安全,并通过理事会决定于12月20日决定2007关于跨欧洲常规铁路系统中铁路隧道安全性的互操作性技术规范,高速称为互操作性或TSI的技术规范。 III Valico di Giovi是欧洲热那亚 - 鹿特丹走廊的一部分,因此,在2005年最终设计的批准后引入之前的提到的TSI。安全设计基于深入分析通过火灾和出拓模型和概率风险分析,导致了安全系统功能布局和性能规范的定义,以及从操作安全的观点来看,欧洲最先进的最终计划的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号